MARRIOTT HOTEL | TABOUK | 2024
GFI delivered full HVAC, plumbing, and low-current systems for the 40,000 m² Marriott luxury resort in Tabuk, including 200+ VRF units, 15,000 m of piping, and integrated fiber, CCTV, and access control networks.
- Date: 2024
- Project client: Al Wataniya Group
- Contract Amount: 24,000,000 SAR
About this Project
GFI delivered comprehensive HVAC, plumbing, and low-current systems for this 40,000m² Marriott-managed luxury resort in Tabuk, Our scope included:
• HVAC: Installed 200+ high-efficiency VRF units with smart zoning
controls to meet Marriott’s strict guest comfort standards
• Plumbing: 15,000+ meters of pressurized piping for water supply, sewage, and storm drainage, including sustainable greywater recycling systems
• Low-Current: Integrated property-wide fiber optic networks, CCTV, and access control with 5,000+ connection points


