KING ABDULLAH FINANCIAL DISTRICT (KAFD) | RIYADH | 2022
GFI executed large-scale mechanical works for the 92,000 m² financial hub, including 32 chillers with BMS, 14 km of chilled water piping, and high-rise dry-pipe sprinkler systems.
- Date: 2022
- Project client: Kabbani Construction Group
- Contract Amount: 38,000,000 SAR
About this Project
GFI executed large-scale mechanical works across this 92,000m²
financial hub, delivering:
• HVAC Excellence: Installed 32 high-efficiency chillers (12,000+ TR total) with BMS integration for smart zoning
• Precision Piping: 14km of pre-insulated chilled water lines with zero thermal loss
• Fire Protection: Engineered dry-pipe sprinkler systems for high-rise tower cores


